Questions Before ConcreteData centres in England and Wales

Home › Glossary

Background

Glossary

Plain-English explanations of the terms used on this site.

For the numbers used to describe data centres (megawatts, IT load, PUE, WUE and more), see Data-centre numbers explained.

AI Growth Zone
An area designated by the UK Government to attract AI data-centre investment, with support on planning and power. South Wales has one.
Backup (standby) generators
Diesel or gas generators that keep a data centre running during a power cut. They are tested regularly and produce emissions when they run.
Call-in
When ministers take a planning decision away from the local council and decide it themselves. A holding direction pauses a decision while they consider this.
CLOUD Act
A 2018 United States law under which US authorities can, in some circumstances, require US-based companies to provide data they control, even if it is stored abroad.
Cooling (air, evaporative, liquid, immersion)
Ways of removing heat from computers. Evaporative cooling uses water directly; air cooling uses more electricity; liquid and immersion cooling bring fluid closer to the chips, and some immersion fluids are PFAS.
Critical National Infrastructure (CNI)
Assets the Government considers essential to the country. Data infrastructure was designated CNI in September 2024.
Data residency / data sovereignty
Residency is where data is physically stored. Sovereignty is whose laws and authorities ultimately control it. They are not the same.
Environmental Impact Assessment (EIA)
A formal process for assessing a large development’s likely significant environmental effects before a decision is made. A screening opinion decides whether one is needed.
Environmental Information Regulations (EIR)
The law giving you a right to environmental information held by public authorities — including water companies. Similar to freedom of information, often with fewer exemptions.
Freedom of Information (FOI)
Your right to ask public bodies for recorded information. Replies are normally due within 20 working days.
Grid connection
The agreement allowing a site to draw a set amount of power from the network. Large connections may need new substations and lines.
Hyperscale
A very large data centre or campus, typically run by one of the major cloud companies.
MW, GW and TWh
Megawatts and gigawatts measure capacity (how much power can be drawn at once; 1 GW = 1,000 MW). Terawatt-hours measure energy used over time.
PFAS (‘forever chemicals’)
Per- and polyfluoroalkyl substances: a large family of man-made chemicals that barely break down in nature. Some fire-suppression gases and cooling fluids used in data centres are PFAS.
Planning Policy Wales / NPPF
The main national planning policy documents for Wales and for England respectively.
Pre-application consultation
In Wales, developers of major schemes must consult the community before submitting a planning application.
Precautionary principle
Where there is a threat of serious or irreversible harm, lack of full scientific certainty should not be a reason to delay action to prevent it.
Water stress
When demand for water is high relative to the amount reliably available. The Environment Agency classifies water-stressed areas in England.
Well-being of Future Generations (Wales) Act 2015
Welsh law requiring public bodies to act in a way that does not compromise the ability of future generations to meet their own needs.
WhatDoTheyKnow
A free website for making freedom of information requests; requests and replies are published so everyone can see them.